In early 2008 a three year major refurbishment programme was started. It included demolishing the old boys’ toilet , thus restoring the front of the building to its original design as the entrance to the Boys School; the removal of false ceilings; replacement of wiring, and heating systems; repairs to the roof and floors; and the building of new toilets. The photo shows the boys’ loo – before and after demolition.
Photo my Tony Morris